This document provides guidelines for the installation of DeltaV TM Scalable Process System in a Class I Division 2 Group A, B, C, D Hazardous Location. Installation shall be in accordance with Article 500 of the National Electrical Code, ANSI/NFPA-70.
Table of Contents:
1. SCOPE ------------------------------------------------------------------------------------------------- 2
2. APPLICATION --------------------------------------------------------------------------------------- 2
3. EQUIPMENT ENCLOSURE---------------------------------------------------------------------- 4
4. INSTALLATION REQUIREMENTS ------------------------------------------------------------ 4
FIGURE 2 - NON-INCENDIVE CIRCUIT WIRING ------------------------------------------------- 7
NON-INCENDIVE DEVICE PARAMETERS --------------------------------------------------------- 8
5. WARNINGS ----------------------------------------------------------------------------------------- 10
6. TABLE 1 APPROVED MODELS-------------------------------------------------------------- 12
7. TABLE 2 KJ2201X1-BA1 SLS FIELD CIRCUIT PARAMETERS-------------------- 21
8. ADDRESSES: --------------------------------------------------------------------------------------22